Building drain
Identify the last accessible interior point included in the inspection.
Independent decision notes for Seattle households
Call 877-702-1610Seattle / note 39
SPU says a Seattle property owner's side sewer generally runs from the building to the connection with the public sewer main. A contractor's inspection may be needed before responsibility can be placed on a specific defect.
Call about the plumbing877-702-1610Scene note
Preserve the first backup point, affected fixtures, cleaning history, side-sewer card or map, camera evidence, and exact location of any finding. Do not enter a pipe or excavation.
First five minutes
Each note narrows the conversation without pretending to reveal a concealed cause.
Identify the last accessible interior point included in the inspection.
Retrieve the available public record without treating linework as current condition.
Request a labeled video with distance, direction, and observed feature.
Give SPU the contractor evidence and retain the utility work-order reference.
Confirm permit, access, right-of-way, and inspection needs for the actual method.
Solution map
SPU may investigate the public main when a contractor identifies a possible public-main or connection issue. Keep the provider's diagnosis distinct from the utility's determination.
Closeout note
A repair record should include ownership boundary, selected method, access and right-of-way needs, permits, inspections, restoration, video, invoice, and remaining maintenance.
Primary desk
Read the current public page before relying on a process or status.