Existing condition
Record the inspected problem and why replacement is being considered.
Independent decision notes for Seattle households
Call 877-702-1610Seattle / note 46
A new fixture should address a supported condition or documented preference, not simply replace uncertainty. Start with the existing dimensions, connections, controls, finish interfaces, and accessibility needs.
Call about the plumbing877-702-1610Scene note
Compare repair and replacement scope with product availability, compatibility, water use, shutoff condition, delivery, removal, permits, inspection, and finish restoration.
First five minutes
Each note narrows the conversation without pretending to reveal a concealed cause.
Record the inspected problem and why replacement is being considered.
Check dimensions, mounting, clearances, connections, and access before ordering.
Name model, finish, features, efficiency label, lead time, and substitutions.
Assign shutoff, piping, electrical, cabinetry, tile, patching, and disposal.
Demonstrate operation and review care, warranty, and remaining work before signoff.
Solution map
For a rental or condominium, confirm who selects the model, approves appearance, owns removed property, coordinates a shutdown, and accepts changes to shared piping.
Closeout note
Closeout needs the exact product, model and serial data, installation record, permit status, representative operation, finish condition, care information, invoice, and warranty.
Primary desk
Read the current public page before relying on a process or status.